Design Approved? Check These Site Interfaces First
Design approval is an important milestone, but it does not automatically mean every detail is ready to build. Interior projects depend on interfaces between drawings, services, materials, specialist information and the existing site. Resolving the right questions before installation reduces uncertainty once trades are working together.

Begin With the Drawing and Scope Baseline
Confirm which drawing revisions, material schedules and specifications make up the approved package. Check that the builder, consultants and suppliers are working from the same current information. Record areas where details are still provisional or where the scope assigns coordination to another party. Without a shared baseline, two people may think a detail has been approved while referring to different versions.
Review Ceilings and Building Services Together
Lighting, air-conditioning, sprinklers, sensors, access panels and ceiling features often compete for the same space. Review their positions and maintenance access as a coordinated ceiling and service layout, using specialist input where required. The same principle applies at floor level where power, data and equipment positions meet joinery or furniture. Design intent should not obscure access or required technical clearances.
Resolve Partitions, Joinery and Material Junctions
A drawing may show a clean line while the site requires an actual junction between a wall, glass screen, door, ceiling, skirting or cabinet. Ask how materials finish, where movement or tolerance is absorbed and which trade completes each interface. Confirm dimensions against site measurements before ordering pieces that depend on fixed sizes. A useful detail is one that can be understood by the installer and checked on site.
Plan Access, Sequencing and Change Decisions
A project can have coordinated drawings and still be constrained by loading access, work-hour restrictions, delivery routes or another contractor's programme. Identify the sequence and any dependencies on client selections, landlord approvals or specialist installations. Agree how design changes will be recorded, reviewed and authorised. When the approval route is clear, site questions become decisions rather than assumptions.
Before site start • One revision set • one agreed scope • coordinated interfaces • confirmed access and responsibilities