Interior Design • Fit-Out • Selected Construction | PURPOSE-LED DESIGN • ENGINEERING-LED EXECUTION

Selected Construction

Engineering-Led Construction for Selected Projects

LSC undertakes selected commercial projects, defined construction packages and specialised scopes where the project requirements align with our engineering and execution capability.

Built in Abu Dhabi since 2007

Actual Construction Photo

Why Selected Construction

The Right Project Matters More Than a Bigger Service List

Construction is part of LSC’s history and capability, but the current focus is deliberate. We take on projects where the scope, technical requirements and delivery model are a strong fit.

Right Scope

The project is clear, or can be defined.

Right Technical Fit

There is real value in engineering and coordination.

Right Delivery Fit

The scope and the way it is delivered suit our capability.

Right Value Logic

The decision is based on value and execution — not only the lowest number.

Selected by fit. Delivered with engineering discipline.

Built Detail

Actual Construction Photo

Where We Fit Best

Construction Where Scope and Engineering Need to Work Together

Selected Commercial & Institutional Projects

Commercial and institutional building or development projects, where the fit is right.

Defined Construction Packages

Defined packages within a larger project, by scope.

Conversions & Major Refurbishments

When the project needs real change to the building — not a cosmetic fit-out only.

Specialised Civil / Structural Scopes

When there is a defined engineering scope we can demonstrate.

Before Commitment

Start by Testing the Project Fit

Before construction moves forward, the project should be understood through its scope, technical requirements, site conditions, interfaces and delivery expectations.

Site Progress

Scope

What is actually required?

Technical Requirements

What complexity or engineering requirements exist?

Site Conditions

What is on the ground?

Interfaces

Who connects to whom — consultant, MEP, suppliers and other works.

Delivery Model

Are the role and responsibilities the right fit?

A clearer go / no-go view before the project is treated as a construction commitment.

Scope & Engineering Review

Make the Scope Buildable Before It Becomes Site Work

Review the construction drawings, quantities, site conditions and civil, structural or building-package interfaces that apply to the defined project scope.

The earlier the scope and interfaces are understood, the fewer avoidable ambiguities reach site.

Drawings & Information

The information available.

Scope Boundaries

What is inside and outside the scope.

Quantities / BOQ

A reference, by stage and by the information available.

Dependencies

Works or approvals linked to another party.

Buildability

Can the method be carried out on site?

Technical Drawing

Site Progress

Built Detail

Engineering Coordination

Coordinate the Project Around the Real Interfaces

Construction coordination considers structural, civil, architectural and MEP interfaces as applicable to the approved package and the real site conditions.

Architectural

Spaces, details and interfaces.

Structural / Civil

By project scope.

MEP

By responsibilities and scope.

Specialist Packages

By project type.

Consultant / Client Inputs

The approvals and decisions required.

If one interface changes another, the effect needs to be understood before the work simply moves ahead.

Technical Drawing

Site Progress

Actual Construction Photo

Approved Information

Site Sequence

Trade Coordination

Built Work

Execution

Turn the Defined Scope Into Built Work

Construction execution follows the defined package through relevant site preparation, trade sequencing, technical checks and recorded completion according to the project requirements.

Typical scope, by project

Civil
Structural
MEP
Architectural works
Specialist packages

Construction decisions should respond to actual conditions rather than forcing the drawing onto the site unchanged.

Site Progress

Actual Construction Photo

Project Visibility

Keep the Important Parts of the Project Visible

Progress is more useful when it shows what is complete, what is active, what is next and which decisions or dependencies can affect the work.

Completed

What is closed.

In Progress

What is active.

Next

The next step.

Open Decision

Needs a decision.

Dependency

Linked to another party or piece of information.

Built Proof

Construction Capability Shown Through the Work

LSC’s construction story should be demonstrated through real project evidence from its history — not through generic contractor imagery.

Actual Construction Photo

Al Nahyan Camp

Location

Location

Scope

Scope

Year

Year

Construction When the Project Needs More Than Interior Fit-Out

Some projects stay entirely within interior design and fit-out. Others require broader building, civil or structural work. Selected Construction gives LSC a route for those projects without changing the core commercial focus.

Have a Construction Scope?

Start With the Scope and the Project Fit

Tell us what the project involves, where it is and what scope is already defined. We’ll start by understanding whether the project and delivery requirements are the right fit.

Actual Construction Photo